ACMA logo
Specializing in the application of advanced engineering technology.Serving the offshore petroleum and marine transportation industry
About Us   |   Services   |   Projects   |   Contact Us   |   Home
Alan C. McClure Associates, Inc. About Us

 

 

Client List

Strategic Partners

Newsroom

Map

Contact Us

McNotes

McNotes   |   Press Releases   |   Articles/Papers   |   Advertising

January 10, 2012: Alan C. McClure Associates (ACMA), one of the industry’s premier naval architecture and engineering firms, announced today that the company has recently expanded its Computational Fluid Dynamics (CFD) analysis capabilities with a 50% increase to computational power, expanding their High Performance Computing (HPC) cluster to 48 processor cores, backed by 92GB of memory.

March 28, 2011:Alan C. McClure Associates (ACMA), one of the industry’s premier naval architecture and engineering firms, announced today that it has formed a professional alliance with Iceberg Project Services (IPS) (www.icebergps.com).

August 18, 2010: Alan C. McClure Associates (ACMA), one of the industry’s premier naval architecture and engineering firms, announced today that the company recently completed relocating its corporate office to 2929 Briarpark, Suite 220, Houston, Texas 77042.

November 24, 2009: Alan C. McClure Associates (ACMA), one of the industry’s premier naval architecture and engineering firms, announced today that the company has begun winding down on their involvement on the HELIX PRODUCER I, the first ship-shaped dynamically-positioned floating production vessel in the Gulf of Mexico.

September 29, 2009: Alan C. McClure Associates (ACMA), recently announced that the company has been selected to develop shipyard construction-level detail drawings for the next generation of TxDOT ferries

July 29, 2009: Alan C. McClure Associates (ACMA), announced today that the company has been successfully pursuing renewable energy projects

June 25, 2009: Alan C. McClure Associates announced today that the first dry dock for a ferry being built for the Texas Department of Transportation (TxDOT) has been completed at Conrad Deepwater in Amelia, Louisiana.

June 5, 2009: Alan C. McClure Associates announced that the company has recently expanded its analysis capabilities by acquiring a license for STAR CCM+, the flagship CFD (Computational Fluid Dynamics) package from CD Adapco

December 31, 2008: Alan C. McClure Associates announced the recent launch of a new 264-foot ferry being built for the Texas Department of Transportation (TxDOT)

April 27, 2006: Alan C. McClure Associates Completes Structural Analysis Project
for K-Sea Transportation

March 8, 2006: Alan C. McClure Associates Concludes Assignment for NOAA
SWATH CMV to Map U.S. Coastal Areas

August 11, 2005: Alan C. McClure Associates Celebrates 30th Anniversary

December 17, 2004: Alan C. McClure Associates Contracted by Unidynamics to design Fully-Articulating Ramp for Littoral Combat Ship

October 25, 2004: Alan C. McClure Associates Signs Cooperative Agreement with Sendit, IIc to Provide Topside Float-Over Technology

September 21, 2004: Alan C. McClure Associates Designs Debris-Clearing Vessel For Guadalupe-Blanco River Authority

April 15, 2004: Alan C. McClure Associates and SeaArk Marine Deliver Crew Boat to Maryland Environmental Services

February 19, 2004: Alan C. McClure Associates Completes Successful Strength Analysis for Hull Repair on FPSO

 


About Us   |   Services   |   Projects   |   Contact Us   |   Home